Keel Laid: May 23, 2013
Christened: June 18, 2016
Commissioned: January 26, 2019
Builder: General Dynamics Bath Iron Works, Bath, Maine
Propulsion system: 2 Rolls-Royce Marine Trent-30 gas turbines
Propellers: two
Length, overall: 600 feet
Beam: 80.7 feet
Draft: 27.6 feet
Displacement: 14,500 tons full load
Speed: 30 knots
Aircraft: two SH-60B/R/F (LAMPS) helicopters
Armament:
- 2 155mm/62 Advanced Gun System (AGS)
- 2 MK 46 Mod 2 30mm Gun Systems
- 20 MK 57 VLS (80 cells) for Standard Missiles, Anti-Submarine Rocket (ASROC), Tomahawk ASM/LAM and Evolved Sea Sparrow
Missile (ESSM)
Homeport: San Diego, CA. |