Keel Laid: August 8, 2006
Christened: May 10, 2008
Commissioned: April 18, 2009
Builder: General Dynamics Bath Iron Works, Bath, Maine
Propulsion system: 4 - LM2500 GE Marine Gas Turbines
Propellers: two
Length, overall: 509.5 - 513.0 feet
Beam: Max 66 feet
Draft: 31 feet
Displacement: 9,192-9,217 tons full load
Speed: 31 knots
Aircraft: two SH-60B/R/F (LAMPS MK III) helicopters
Armament:
- 1 MK-45 MOD 4 5"/62 caliber lightweight gun
- 1 MK-15 20mm Phalanx CIWS
- 2 MK-38 MOD 2 25mm Machine Gun System (MGS)
- 2 MK-41 VLS (96 cells) for Standard Missiles, Anti-Submarine Rocket (ASROC), Tomahawk ASM/LAM and RIM-162 ESSM
- 2 MK-32 MOD 15 triple torpedo tubes (six MK 50/46
MOD 5A Torpedoes)
- 1 Optical Dazzling Interdictor, Navy (ODIN) laser system
Homeport: San Diego, CA. |